Pilon Office Build

The London based construction contractor, PiLON wanted to extend their offices in a part of the building that was not used before. Due to our lond standing work with them, they choosed Zekon Ltd. to make this build for them.

The project took 2 months to complete and our worked included: fake walls, flooring, plumbing, electrical, glass walls, general building work.

Construction date: 2018
Location: London
Scope of works: Pilon Office Refurbishment
Investors: PiLON
Download a complete catalog of our services and company presentation
Download